Line Extension Charges

Line Extension Charges...

Single Phase Line Extension - printer friendly version
 
Revised April 4, 2013
 
A non-refundable deposit fee will be required to be paid prior to any site visit. The deposit fee will apply towards the line extension fees.

Deposit Fee        $250.00

 

Line Extension Fees Single Phase  (Permanent residential, year around - Home)

Construction Fee/Footage (0-10ft)          $1,100.00 

Construction Fee/Footage (10-200ft)       $1,600.00  

Per Foot Charge after the First 200 Feet         $6.00

 

Line Extension Fees Single Phase  (Permanent residential, seasonal - Cabin)

Construction Fee/Footage (0-10ft)          $1,600.00  

Construction Fee/Footage (10-200ft)       $2,100.00

Per Foot Charge after the First 200 Feet         $6.00

 

Line Extension Fees Single Phase  (*Non-permanent and minimal use - Camper)

Construction Fee/Footage (0-10ft)          $2,100.00

Construction Fee/Footage (10-200ft)       $2,600.00

Per Foot Charge after the First 200 Feet         $6.00

 

Connection Fee         $20.00 

Membership Fee         $5.00

Road Crossing Fee (plus any local fees)      $500.00

Directional boring charge will be applied when plowing isn’t feasible                         $9.75 per ft

Road permit Fees from Township/County are an additional cost.

Brushing Fees will apply when proposed route warrants clearing (12ft path)

Temporary Service Connection         $400.00

Temporary Service Connection  (monthly charge after 6 months)   $32.00 per month

        *A non-permanent residence is a structure that meets all the requirements: Has no pressure water system, not connected to sewer system, is less than 600 square ft., and no foundation. 

 

All three phase extensions will be based on actual estimate cost. 

 

A frost charge of $4.00 per ft applies from November 01 – April 15 

 

A road crossing will be considered a special charge (see 7.4.4 Construction Obstacles) for any new line extensions therefore the road crossing fee will apply where applicable.  

Single Meter Ped to Double Meter Ped change                   $750.00

Meter Pedestal Pricing 

  • 200 amp single meter pedestal installed      $745.00 
  • 200 amp double meter pedestal installed      $1100.00 
  • 320 amp meter pedestal installed                $1,480.00

 

UNDERGROUND CONSTRUCTION - FROST CHARGE POLICY
Revised 1/20/04 

The Cooperative will apply a frost charge of $4.00 per foot for underground construction from November 1st to April 15th. The frost charge will be prepaid in advance of construction. If the Cooperative deems that the frost charge or a portion of the frost charge did not apply during the period stated above, the Cooperative reserves the right to waive the frost charge or a portion of the frost charge. Any prepaid frost charge or portion thereof that the Cooperative waives will be refunded.  

If normal construction is extended into the frost charge period and the frost charge is applicable and not paid in advance, it will be billed accordingly.

 

 SCHEDULES OF FEES AND DEPOSITS

Line Extension Fees Three Phase (Large Power and Irrigation Classification)

  • Actual Construction Cost (Less applicable construction allowance based on usage and load characteristics and applicable rebates on equipment that saves energy).
  • Estimated construction costs must be paid prior to the start of construction. 

Line Extension Fees Three Phase (Non-permanent, minimal use, or non- standard service)

  • Actual Construction Cost
  • Estimated construction costs must be paid prior to the start of construction.